Quantcast
Channel: Exeter Express and Echo Latest Stories Feed
Viewing all articles
Browse latest Browse all 7823

Alphington, Haldon Hill and Telegraph Hill to be hit by planned roadworks

$
0
0
Exeter residents are set to be hit by traffic delays after The Highways Agency announced its planned roadworks for next week. The agency revealed the summary of planned new and ongoing road improvements for Monday 5 January – Sunday 11 January 2015. Included on this list is Telegraph Hill, Alphington and Haldon Hill. The Agency added the improvement work is carried out with the aim of causing as little disruption as possible.Full list: A38 Dry Bridge, nr South Brent – New bridge scheme 24hr eastbound exit sliproad closure. Access for residents only. Diversion via Dart Bridge. (30 Oct – 23 April) 24hr narrow lanes and 40mph limit on main carriageway. (10 Nov – 23 April 2015) A38 Kennford, nr Exeter – Junction improvement 24hr contraflow and 50mph limit. Splatford bridge closed with access for residents only. Diversion via A380 southbound up Telegraph Hill to Great Haldon and minor road past Exeter Racecourse to A38. (17 Nov – 31 March 2015) A38 Dobwalls – Resurfacing 24hr contraflow and 40mph limit for resurfacing (13 Oct – 21 May 2015) A30 Between Carminnow Cross and Innis Down, nr Bodmin – Drainage works 24hr east and westbound lane closure and 50mph speed limit (25 Nov – 20 March) A38 Manadon, Plymouth – Junction improvement 24hr eastbound narrow lanes and 50mph speed limit. (6 Oct – 6 Feb) 24hr westbound narrow lanes and 50mph speed limit. 24hr westbound entry sliproad closure, diversion via Weston Mill. Westbound carriageway closure from 8pm to 6am Tues and Thurs – diversion via St Budeaux (6 Jan – 31 March). A38 Drumbridges Jct, Heathfield, nr Bovey Tracey – Junction improvement Various lane closures on slip roads and roundabout (27 Nov to 30 April) A30 Between Fingle Glen and Alphington, Exeter – Resurfacing Eastbound lane and carriageway closures from 7pm to 6am Mon to Fri. Diversions via local road (6-17 Jan) A38 Haldon Hill, nr Exeter – BT cabling works Westbound lane closure from 9pm to 6am (5-10 Jan) A30 Between Innis Downs and Carminnow Cross, nr Bodmin – Drainage works 24hr eastbound lane closure and 50mph speed limit (26 Nov – 20 March) A30 Between Callywith and Innis Downs, nr Bodmin – Drainage works East and westbound carriageway closure from 8pm to 6am. Diversion via A389 through Bodmin (4 – 8 Jan) A30 Cannaframe, nr Launceston – Surveys Westbound lane closure from 9am to 4pm (6-9 Jan) A30 Rose-an-Grouse, nr Penzance – Repair work Traffic signals from 7pm to 10.30pm (6 Jan) A30 Fivelances, nr Launceston – Surveys Eastbound lane closure from 7.30pm to 4am (6-7 Jan) A30 Plusha, nr Launceston – Surveys Westbound lane closure from 7.30pm to 4am (7-8 Jan) A30 Bolventor, nr Bodmin – Surveys Westbound lane closure from 7.30pm to 4am (8-9 Jan) A30 Temple, nr Bodmin – Surveys Westbound lane closure from 7.30pm to 4am (9-10 Jan) A38 Between Menheniot and Liskeard – Drainage works Westbound lane closure from 7pm to 4am (6-10 Jan) Eastbound lane closure from 7pm to 4am (6-7 Jan) A38 Glynn Valley – Surveys Traffic signals from 7.30pm to 4am (7-8 Jan) A38 Saltash Tunnel – Maintenance works East and westbound carriageway closures from 8pm to 6am. Signed diversion via Saltash. (8-11 Jan) A38 Catchfrench – Drainage works Traffic signals from 8pm to 2am (8-9 Jan)

Alphington, Haldon Hill and Telegraph Hill to be hit by planned roadworks


Viewing all articles
Browse latest Browse all 7823

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>