The Highways Agency has today published its summary of planned new and ongoing road improvements over the coming week as correct of 3 October.See the full list below.
A30 Sourton Cross, nr Okehampton – Drainage works
24hr westbound lane closure Sun to Fri and 50mph speed limit (28 Sept – 17 Oct)
A30 Stowford, nr Launceston – Drainage works
24hr westbound lane closure Sun to Fri and 50mph speed limit (28 Sept – 7 Nov)
A30 Whiddon Down, nr Okehampton – Drainage surveys
Eastbound lane closure from 7pm to 4am (2-4 Oct)
A30 Stowford, nr Okehampton – Road stud replacement
Eastbound lane closure from 7pm to 6am (3-4 Oct)
A30 Between Stowford and Sourton Cross, nr Okehampton – Road stud replacement
Eastbound carriageway closure from 7pm to 6am. Diversion via Sprytown, Lewdown and Bridestowe (3-4 Oct)
A30 Sourton Cross, nr Okehampton – Drainage works
24hr eastbound lane closure from Sunday night to Friday morning and 50mph speed limit. (5-17 Oct)
A30 Stowford, nr Launceston – Drainage works
24hr eastbound lane closure and 50mph speed limit from Sun night to Fri (5 Oct – 7 Nov)
A30 Between Sourton Cross and Tongue End, nr Okehampton – Road stud replacement
Eastbound carriageway closure from 7pm to 6am. Diversion via B3260 through Okehampton.
A30 Whiddon Down, nr Okehampton – Drainage surveys
Westbound lane closure from 7pm to 4am (6-8 Oct)
A30 Launceston bypass – Road stud renewal
East and westbound lane closure and convoy working from 7.30pm to 4am (8-9 Oct)
A30 Avers, Redruth – Resurfacing
Westbound exit sliproad closure from 7pm to 6am. Diversion via A30 to Tolvaddon and A3074 back to Avers. (29 Sept – 4 Oct)
Eastbound exit sliproad closure from 7pm to 6am. Diversion via A30 to Chiverton Cross and back to Avers. (30 Sept – 4 Oct)
A30 Treswithian, nr Redruth – Resurfacing
Lane closure on slip roads from 7pm to 6am (1-4 Oct)
A30 Callywith, nr Bodmin – Road stud renewal
Westbound lane closure and convoy working from 7.30pm to 4am (3-4 Oct)
A30 Fivelanes, nr Launceston – Road stud renewal
Eastbound lane closure and convoy working from 7.30pm to 4am (6-7 Oct)
A30 Plusha, nr Launceston – Road stud renewal
Eastbound lane closure and convoy working from 7.30pm to 4am (7-8 Oct)
A30 Trebursye, nr Launceston – Road stud renewal
Westbound lane closure and convoy working from 7.30pm to 4am (10-11 Oct)
A38 Dobwalls Bypass – Safety scheme
24hr east and west bound lane closure and 40mph speed limit (24 Sept – 12 Oct)
A38 Notter Bridge, nr Saltash – Surveys
Traffic signals from 7.30pm to 4am (8-10 Oct)
A38 Turfdown, nr Bodmin – Road stud replacement
Traffic signals from 7.30pm to 4.30am (9-10 Oct)
A38 Heathfield, nr Bovey Tracey – Barrier works
Westbound lane closure from 7pm to 6am (6-11 Oct)
A38 Manadon, Plymouth – Junction improvements
24hr eastbound narrow lanes and 50mph speed limit. Eastbound carriageway closure between Manadon and Marsh Mills between 8pm and 6am. Eastbound entry sliproad closed from 7pm. Diversion via B3413 (6-11 Oct)
A38 Kennford, nr Exeter – Junction improvements
East and westbound lane closures from 8pm to 6am (6 Oct - 31 March)
A38 Menheniot, nr Liskeard – Road stud replacement
Westbound lane closure and convoy working from 7.30pm to 4.30am (10-11 Oct)
A38 Between Carkeel and Saltash Tunnel – Maintenance works
Eastbound lane closure from 7.30pm to 6am (10-12 Oct)
A38 Saltash Tunnel – Maintenance works
East and westbound lane closures from 8pm to 6am. Signed diversions via Saltash.
↧