The following is a summary of planned new and ongoing road improvements over the coming week issued by the Highways Agency. It could be subject to change due to weather conditions or unforeseen circumstances:
A30 Various locations between Fingle Glen and M5 J31 nr Exeter – Surveys
Eastbound lane closures from 7pm to 4am Mon-Fri (23 June 1 July)
A30 Ebsworthy, nr Okehampton – Drainage works
24hr east and westbound lane closure (30 June – 2 July)
A30 Between M5J31 and Alphington – Surveys
Westbound lane closure from 7pm to 4am (1-4 July)
A38 Kennford, nr Exeter – Surveys
Eastbound lane closure from 8pm to 5am Mon-Fri (23 June – 1 July)
Westbound lane closure from 8pm to 5am (30 June – 1 July)
A38 Manadon, Plymouth – Surveys
Eastbound lane closure from 8pm to 5am (1-3 July)
Westbound lane closure from 8pm to 5am (3-4 July)
A38 Buckfastleigh - Surveys
Westbound lane closure from 7.30pm to 4am (4-9 July)
A30 Treswithian, nr Redruth – Junction improvements
Westbound lane closure from 3pm to 6am Mon – Fri (16 June – 5 July)
A30 Between St Erth and Treswithian, nr Redruth – Junction improvements
East and westbound carriageway closures from 7.30pm to 6am Mon to Fri. Diversion via B3301 through Hayle and former A30 through Connor Downs. Traffic lights on St Erth roundabout (16 June – 5 July)
A30 Launceston Bypass – Resurfacing
24hr westbound lane closure (29 June – 3 July)
A38 Moorswater, nr Liskeard – Drainage works
24hr lane narrowing on westbound entry sliproad (9 June – 11 July)
A38 Saltash Tunnel – Maintenance work
Westbound and eastbound carriageway closure from 8pm to 6am. Diversion via B3271 through Saltash (4-6 July)
↧